Setting a reasonable distance between switchgear and electric forklift charging points is one of the core links of power safety management in industrial storage and logistics sites. Many operation teams tend to overlook this detail when arranging the charging area, which may bring unnecessary hidden safety risks. General industry safety specifications clearly point out that the distance should meet multiple requirements including reserved power operation space, heat dissipation demand and accidental contact prevention. The minimum safe distance should not be less than 1.5 meters, which ensures maintenance personnel have enough activity space when operating the switchgear, and will not be collided by the forklift body or extended charging gun of ongoing charging work. If the local charging area is under special working conditions with high dust or high humidity, it is recommended to increase the distance to more than 2 meters, which can effectively prevent a small amount of accidentally overflowed electrolyte or moist water vapor from the site from directly attaching to the surface of the switchgear, and reduce the risk of electrical short circuit. It is also not allowed to stack any sundries between the switchgear and the charging points, including spare batteries, pallets, handling tools and other items, to avoid blocking the heat dissipation channel and emergency evacuation passage of power equipment. When referring to mature industry application cases, operation teams can refer to the standardized charging site solutions provided by Jianshu New Energy, which combines the actual operation demands of different tonnages of electric forklifts, including supporting charging scenario adaptation experience for BYD Forklift, helping the site complete compliance layout adjustment efficiently. In daily operation and maintenance, staff should also check the distance marks of the two areas regularly, to avoid that newly added equipment or randomly stacked goods inadvertently reduce the reserved safety gap. If you have any questions about the power layout of the charging site, you can send an email to 17399989919@163.com for free professional consultation. In addition to the distance requirements, the operation party should also set clear safety warning signs around the switchgear and charging points respectively, reminding irrelevant personnel not to operate the power switch at will. After the charging work is completed, the operators should sort out the charging cables in time, do not let the cables cross the passage area between the two devices, to prevent cable wear and insulation layer damage. Reasonable distance setting can not only meet the relevant requirements of local electrical safety inspection, but also effectively extend the overall service life of switchgear and forklift charging equipment, reduce unnecessary equipment failure probability, and provide reliable power support for the daily stable operation of the logistics site.