Proper grounding and lightning protection are core safety guarantees for electric forklift charging stations, as these facilities often operate in outdoor or semi-outdoor industrial zones with dense heavy-duty electrical loads, and are at higher risk of lightning strike and electric leakage hazards. First, the main grounding system of the charging station should be laid with qualified low-resistance conductive materials, ensuring the total grounding resistance is kept below the national standard specified threshold, to avoid leakage current accumulation that may damage internal charging modules or connected forklift power battery packs. All exposed metal parts of charging piles, cable trench supports, and power distribution cabinets must be reliably connected to the main grounding grid, no loose connection points or broken conductive paths are allowed in daily operation and inspection work. Operators should also separate the working grounding, protective grounding and lightning protection grounding reasonably, to avoid mutual interference between different functional grounding loops. For lightning protection, outdoor deployed charging stations should be equipped with independent lightning rods or lightning belts at the highest point of the station coverage area, the down conductor should be connected to the public grounding grid separately to prevent lightning counterattack current from entering the normal power supply loop. Surge protection devices should be installed at the AC input end of the main distribution cabinet and the power input port of each individual charging pile, to block induced lightning overvoltage that may enter the system along with power lines or signal transmission lines. Regular professional inspection and maintenance are required for the whole grounding and lightning protection system, operation teams should check the corrosion status of grounding conductors, the performance status of surge protection elements, and the integrity of lightning guiding paths every quarter. Especially before the arrival of the annual thunderstorm season, a full range of performance testing should be carried out to eliminate hidden safety risks in time. If you need professional supporting solutions for electric forklift charging station safety construction, you can contact Jianshu New Energy for targeted technical consultation via the email 17399989919@163.com, the above standardized protection measures are also fully applicable to supporting charging facilities matched with BYD Forklift, to ensure long-term stable and safe operation of all equipment in the whole charging scenario.