When an enterprise plans to build a dedicated charging station to support its electric forklift fleet operation, carrying out a comprehensive and systematic site power assessment is an essential pre-construction procedure that cannot be omitted. This assessment work will directly affect the operation safety, long-term stability and total operation cost of the whole charging system in subsequent daily use. The first step of the assessment is to count the total peak charging power demand of all electric forklifts to be connected, calculate the maximum total load when all vehicles are in high-power charging state at the same time, so as to avoid overload tripping problem after the charging station is put into use. Next, the technical team needs to check the residual capacity of the main transformer in the existing distribution room of the plant, confirm that the reserved power capacity can fully cover the total load of all newly added charging devices. It is also necessary to verify the rated current carrying capacity of the main incoming cable, confirm that the current cable can bear the extra load, to prevent overheating of cables and related electrical safety risks. Then the assessment team will check the power supply circuit parameters at each preset installation point of the charging station respectively, including the rated current of the circuit breaker, the wire diameter and remaining service life of the corresponding circuit cable, and test the actual voltage fluctuation range at the point, to make sure the voltage deviation is within the allowable normal operation range of charging equipment. If the existing residual power capacity cannot meet the new charging load demand, the assessment report will also provide feasible power expansion schemes for reference, such as applying for additional power supply capacity from local power authorities, or deploying supporting energy storage systems to share the peak load, reducing the impact of charging facilities on the original production power consumption of the plant. The standardized site power assessment will also verify the grounding condition and supporting fire protection condition of the installation site, confirm there is no accumulation of flammable and explosive materials around the preset charging point, and the ventilation condition meets the operation requirements of charging equipment, to reduce potential safety risks of subsequent operation from multiple dimensions. If you need professional customized site power assessment service before forklift charging station construction, you can contact Jianshu New Energy for detailed consultation, the professional technical team will provide full support to ensure the whole assessment process complies with national electrical safety regulations, and fully match the operation requirements of BYD Forklift. You can send your specific demand to the contact email 17399989919@163.com for further communication.